BARSTOW, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) continues work on Interstate 15 to rehabilitate the existing pavement. Work schedule is as follows, with weather permitting.
Lanes and ramp closures: July 19 to morning July 23:
• Monday, July 19 from 8:00 p.m. to 6:00 a.m. Northbound alternating lane closures approaching and from Lenwood Road (at the Outlet Center) to Riverside Drive. Ramp closures: Lenwood Road (at the Outlet Center) and Riverside Drive.
on and off ramps may be closed.
• Monday, July 19 from 9:00 p.m. to 8:00 a.m. Southbound alternating lane closures approaching and from Riverside Drive to Sidewinder Road. Ramp closures: Riverside Drive and Sidewinder Road on and off ramps
may be closed.
• Wednesday, July 21 from 9:00 p.m. to 8:00 a.m. Southbound alternating lane closures approaching and from Riverside Drive to Sidewinder Road. Ramp closures: Riverside Drive and Sidewinder Road on and off ramps
may be closed.
• Thursday, July 22 from 9:00 p.m. to 7:00 a.m Friday. Southbound alternating lane closures approaching and from Riverside Drive to Sidewinder Road. Ramp closures: Riverside Drive and Sidewinder road on and off ramps may
be closed. Be advised, CHP will be on location to assist with traffic each day.
There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 98,000 members. Join the NEW group on MeWe. Like us on Facebook, Follow us on Twitter and Instagram.