May 15, 2026 7:59 PM

Update on the Cajon Pass Weigh Station Relocation Project

CAJON PASS, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) is updating construction on Interstate 15 (I-15) the southbound Cajon Pass Weigh Station Relocation Project.

Caltrans said they are on track for completion by the end of September 2025 if Weather permitting.

This project is to relocate only the southbound Cajon Pass Weigh Station to the Truck Safety Brake Check Area at the top of the Cajon Pass. This will combine the Truck Safety Brake Check Area and the Cajon Weigh Station in one location.

There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 157,000 members. Join the group on MeWe. Like us on the NEW page on Facebook. Follow us on NewsBreak, and also follow us on Instagram, Threads, and X aka Twitter.

loader-image
Cajon Pass
7:59 pm, May 15, 2026
temperature icon 61°F
clear sky
Humidity: 59 %
Pressure: 1011 mb
Wind: 17 mph
Wind Gust: 12 mph
Clouds: 0%
Visibility: 10 km
Sunrise: 5:47 am
Sunset: 7:44 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
8:00 pm
temperature icon
56°/61°°F 0 mm 0% 7 mph 59% 1011 mb 0 mm/h
11:00 pm
temperature icon
54°/58°°F 0 mm 0% 9 mph 60% 1011 mb 0 mm/h
2:00 am
temperature icon
52°/55°°F 0 mm 0% 8 mph 62% 1011 mb 0 mm/h
5:00 am
temperature icon
51°/51°°F 0 mm 0% 8 mph 64% 1010 mb 0 mm/h
8:00 am
temperature icon
55°/55°°F 0 mm 0% 9 mph 49% 1010 mb 0 mm/h
11:00 am
temperature icon
63°/63°°F 0 mm 0% 10 mph 35% 1009 mb 0 mm/h
2:00 pm
temperature icon
72°/72°°F 0 mm 0% 9 mph 29% 1007 mb 0 mm/h
5:00 pm
temperature icon
70°/70°°F 0 mm 0% 11 mph 36% 1005 mb 0 mm/h