April 2, 2026 12:30 PM

Roadwork Continues on I-15 from Hesperia to Victorville Monday and Saturday Morning

HESPERIA, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) will continue work on a $122 million project to rehabilitate and repave traffic lanes and ramps and upgrade the drainage systems in Hesperia to Victorville in the center divider/right shoulders on Interstate 15 in San Bernardino County. This project will not add a extra lane to the freeway or for a high speed train.

As of the end of January the project is 58% completion and still on track.

Be advised New Traffic Pattern Crews are working to shift traffic to the newly paved outside lines. Watch for lane reconfigurations.

***In the event of rain – NB /SB lanes #1 and #2 will close due to potential flooding.

Hours of operation: Monday – Saturday Morning

Northbound I-15 from Oak Hill Rd to Bear Valley Rd – 9pm to 7am.**

• Alternating lane closures, possibly bringing lanes down to one.

• *All on / off ramps are subject to intermittent closures for crew safety and related roadwork.

• Connector closures may take place: NB/SB I-15 to NB/SB US 395 during operations. Watch for signage.

• NB Joshua and Main Street off ramps: Oversized loads must use lanes 1 and 2.

Southbound I-15 from Bear Valley Rd to Oak Hill Rd – 6pm. – 5am**.

• Alternating lane closures, possibly bringing lanes down to one.

• *All on / off ramps are subject to intermittent closures for crew safety and related roadwork.

• Connector closures may take place: NB/SB I-15 to NB/SB US 395 during operations. Watch for signage.

• In order to exit at SB Oak Hills off ramp, traffic must be in lanes 3 and 4. K-rail separates the inside lanes and does not allow access.

**Times can subject to change and could go longer or start earlier. On and off ramps may be subject to closure. Please use caution and remember to reduce your speed when approaching and driving through the construction zones. Schedules are subject to change due to inclement weather or construction issues.

The project is expected to be complete in Spring 2025.

There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 137,000 members. Join the group on MeWe. Like us on the NEW page on Facebook. Follow us on NewsBreak, and also follow us on Instagram, Threads, and X aka Twitter.

loader-image
Cajon Pass
12:30 pm, Apr 2, 2026
temperature icon 56°F
overcast clouds
Humidity: 54 %
Pressure: 1014 mb
Wind: 10 mph
Wind Gust: 8 mph
Clouds: 100%
Visibility: 10 km
Sunrise: 6:35 am
Sunset: 7:10 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
2:00 pm
temperature icon
56°/56°°F 0 mm 0% 6 mph 53% 1013 mb 0 mm/h
5:00 pm
temperature icon
56°/56°°F 0 mm 0% 7 mph 48% 1011 mb 0 mm/h
8:00 pm
temperature icon
50°/50°°F 0 mm 0% 2 mph 63% 1012 mb 0 mm/h
11:00 pm
temperature icon
48°/48°°F 0 mm 0% 2 mph 74% 1015 mb 0 mm/h
2:00 am
temperature icon
45°/45°°F 0 mm 0% 7 mph 70% 1015 mb 0 mm/h
5:00 am
temperature icon
47°/47°°F 0 mm 0% 8 mph 61% 1016 mb 0 mm/h
8:00 am
temperature icon
51°/51°°F 0 mm 0% 14 mph 29% 1019 mb 0 mm/h
11:00 am
temperature icon
57°/57°°F 0 mm 0% 19 mph 16% 1020 mb 0 mm/h