March 10, 2026 4:59 AM

This Week Roadwork On Interstate 15 In Hesperia New Traffic Pattern

HESPERIA, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) will continue work on a $122 million project to rehabilitate and repave traffic lanes and ramps and upgrade the drainage systems in the center divider on Interstate 15 in San Bernardino County. This project will not add a extra lane to the freeway or for a train.

Watch for the new traffic pattern.

The bypass lane will have two lanes to the left and two lanes to the right with a center guardrail around the repaving middle lane. They are repaving that lane for approximately 1 mile at a time. This new traffic pattern will go on for months from around Ranchero Rd. to Highway 395 in both directions. Expect Major Delays at night and around 4am-5am morning daily.

  • Highway 395 connector closures could be closed in both directions at times.
  • In the event of significant rain, NB and SB, lanes #1 and #2 will close due to potential flooding. 

Monday night –  Saturday morning – 5/1-5/6 (Weekend schedule subject to change)

Northbound I-15 from Oak Hill Rd to Main Street – 9pm. to 9am* Saturday until 7am*

  • Alternating lane closures, possibly bringing lanes down to one.
  • All on and off ramps are subject to intermittent closures for crew safety and related roadwork.
  • Traffic maybe backup after Highway 138 for about 2 miles.

Southbound I-15 from Main Street to Oak Hill Rd – 8pm. – 4am* Saturday until 7am*

  • Alternating lane closures, possibly bringing lanes down to one.
  • All on and off ramps are subject to intermittent closures for crew safety and related roadwork.

*Times can subject to change and could go longer or start earlier. On and off ramps may be subject to closure. Please use caution and remember to reduce your speed when approaching and driving through the construction zones. Schedules are subject to change due to inclement weather or construction issues.

Possible onramps and offramps could be closed during paving operation.

The project is expected to be complete in early 2025.

There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 126,000 members. Join the NEW group on MeWe. Like us on are new page on Facebook. Follow us on Twitter and Instagram.

loader-image
Cajon Pass
4:59 am, Mar 10, 2026
temperature icon 47°F
few clouds
Humidity: 79 %
Pressure: 1014 mb
Wind: 14 mph
Wind Gust: 15 mph
Clouds: 14%
Visibility: 10 km
Sunrise: 7:06 am
Sunset: 6:52 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
5:00 am
temperature icon
35°/47°°F 0 mm 0% 6 mph 79% 1014 mb 0 mm/h
8:00 am
temperature icon
38°/44°°F 0 mm 0% 8 mph 80% 1015 mb 0 mm/h
11:00 am
temperature icon
54°/58°°F 0 mm 0% 5 mph 62% 1016 mb 0 mm/h
2:00 pm
temperature icon
64°/64°°F 0 mm 0% 7 mph 43% 1016 mb 0 mm/h
5:00 pm
temperature icon
60°/60°°F 0 mm 0% 8 mph 44% 1016 mb 0 mm/h
8:00 pm
temperature icon
53°/53°°F 0 mm 0% 5 mph 71% 1019 mb 0 mm/h
11:00 pm
temperature icon
52°/52°°F 0 mm 0% 3 mph 69% 1021 mb 0 mm/h
2:00 am
temperature icon
51°/51°°F 0 mm 0% 3 mph 58% 1021 mb 0 mm/h