March 9, 2026 2:33 PM

Roadwork Continue on I-15 in Hesperia and Starts Monday Night – Saturday Morning

HESPERIA, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) will continue work on a $122 million project to rehabilitate and repave traffic lanes and ramps and upgrade the drainage systems in Hesperia to Victorville in the center divider/right shoulders on Interstate 15 in San Bernardino County. This project will not add a extra lane to the freeway or for a high speed train to Las Vegas.

As of the end of March the project is 98% completion and still on track.

Crews are currently performing operations in the center median, shoulder areas and at various on and offramps. Crews will continue K-Rail movement in the center divider to and configuration lane changes back to the old way on I-15. Also crews will be restriping traffic lanes, putting in rumble strip in the right shoulder and update signages.

The K-Rail will stay in place for the upcoming train to Las Vegas that will be starting soon.

Hours of operation: Monday night – Saturday Morning.

Northbound I-15 from Oak Hill Rd. to Bear Valley Rd. – 9pm to 7am.**

• Alternating lane closures, possibly bringing lanes down to one at times.

• *All on / off ramps are subject to intermittent closures for crew safety and related roadwork.

• Connector closures may take place: NB/SB I-15 to NB/SB Hwy 395 during operations. Watch for signage.

• NB Ranchero Road, Hwy 395, and Main Street on and off ramps may be closed:

Southbound I-15 from before Bear Valley Rd to Ranchero Rd – 7pm. – 5am**.

• Alternating lane closures, possibly bringing lanes down to one.

• *All on / off ramps are subject to intermittent closures for crew safety and related roadwork. Bear Valley Road, Main Street and Joshua St may be closed.

• Connector closures may take place: NB/SB I-15 to NB/SB US 395 during operations. Watch for signage.

**Times can subject to change and could go longer or start earlier. On and off ramps may be subject to closure. Please use caution and remember to reduce your speed when approaching and driving through the construction zones. Schedules are subject to change due to inclement weather or construction issues.

The project is expected to be complete in Spring 2025.

There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 159,000 members. Join the group on MeWe. Like us on the NEW page on Facebook. Follow us on Instagram, and also follow us on Threads, and X aka Twitter.

loader-image
Cajon Pass
2:33 pm, Mar 9, 2026
temperature icon 67°F
clear sky
Humidity: 23 %
Pressure: 1010 mb
Wind: 15 mph
Wind Gust: 10 mph
Clouds: 0%
Visibility: 10 km
Sunrise: 7:08 am
Sunset: 6:52 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
5:00 pm
temperature icon
59°/65°°F 0 mm 0% 8 mph 28% 1010 mb 0 mm/h
8:00 pm
temperature icon
48°/54°°F 0 mm 0% 5 mph 54% 1011 mb 0 mm/h
11:00 pm
temperature icon
39°/39°°F 0 mm 0% 4 mph 79% 1014 mb 0 mm/h
2:00 am
temperature icon
36°/36°°F 0 mm 0% 3 mph 80% 1014 mb 0 mm/h
5:00 am
temperature icon
43°/43°°F 0 mm 0% 5 mph 79% 1014 mb 0 mm/h
8:00 am
temperature icon
47°/47°°F 0 mm 0% 5 mph 81% 1016 mb 0 mm/h
11:00 am
temperature icon
59°/59°°F 0 mm 0% 5 mph 51% 1017 mb 0 mm/h
2:00 pm
temperature icon
64°/64°°F 0 mm 0% 8 mph 41% 1015 mb 0 mm/h