March 8, 2026 4:58 PM

Roadwork Continues on I-15 in Hesperia Monday Night – Saturday Morning

HESPERIA, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) will continue work on a $122 million project to rehabilitate and repave traffic lanes and ramps and upgrade the drainage systems in Hesperia to Victorville in the center divider/right shoulders on Interstate 15 in San Bernardino County. This project will not add a extra lane to the freeway or for a high speed train.

As of the end of November the project is 92% completion and still on track.

Crews are currently performing operations in the center median, shoulder areas and at various on and offramps. Crews will continue K-Rail movement in the center divider to and configuration lane changes back to the old way on I-15.

Hours of operation: Monday night – Saturday Morning.

Northbound I-15 from Oak Hill Rd to Bear Valley Rd – 9pm to 7am.**

• Alternating lane closures, possibly bringing lanes down to one at times.

• *All on / off ramps are subject to intermittent closures for crew safety and related roadwork.

• Connector closures may take place: NB/SB I-15 to NB/SB Hwy 395 during operations. Watch for signage.

• NB Ranchero Road, Hwy 395, and Main Street off ramps may be closed: Oversized loads must use lanes 1 and 2.

Southbound I-15 from before Bear Valley Rd to Ranchero Rd – 7pm. – 5am**.

• Alternating lane closures, possibly bringing lanes down to one.

• *All on / off ramps are subject to intermittent closures for crew safety and related roadwork. Main Street and Joshua St may be closed.

• Connector closures may take place: NB/SB I-15 to NB/SB US 395 during operations. Watch for signage.

**Times can subject to change and could go longer or start earlier. On and off ramps may be subject to closure. Please use caution and remember to reduce your speed when approaching and driving through the construction zones. Schedules are subject to change due to inclement weather or construction issues.

The project is expected to be complete in Spring 2025.

There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 151,000 members. Join the group on MeWe. Like us on the NEW page on Facebook. Follow us on NewsBreak, and also follow us on Instagram, Threads, and X aka Twitter.

loader-image
Cajon Pass
4:58 pm, Mar 8, 2026
temperature icon 68°F
clear sky
Humidity: 12 %
Pressure: 1013 mb
Wind: 11 mph
Wind Gust: 12 mph
Clouds: 1%
Visibility: 10 km
Sunrise: 7:09 am
Sunset: 6:51 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
5:00 pm
temperature icon
64°/68°°F 0 mm 0% 13 mph 12% 1013 mb 0 mm/h
8:00 pm
temperature icon
55°/64°°F 0 mm 0% 6 mph 16% 1013 mb 0 mm/h
11:00 pm
temperature icon
52°/57°°F 0 mm 0% 4 mph 20% 1013 mb 0 mm/h
2:00 am
temperature icon
49°/49°°F 0 mm 0% 4 mph 24% 1012 mb 0 mm/h
5:00 am
temperature icon
50°/50°°F 0 mm 0% 4 mph 21% 1011 mb 0 mm/h
8:00 am
temperature icon
51°/51°°F 0 mm 0% 1 mph 29% 1011 mb 0 mm/h
11:00 am
temperature icon
61°/61°°F 0 mm 0% 5 mph 27% 1011 mb 0 mm/h
2:00 pm
temperature icon
65°/65°°F 0 mm 0% 7 mph 27% 1009 mb 0 mm/h