April 27, 2026 9:40 PM

This Weeks I-15 Roadwork at Night from Hesperia to Victorville

HESPERIA, CA. (Pain In The Pass) >> The California Department of Transportation (Caltrans) will continue work on a $122 million project to rehabilitate and repave traffic lanes and ramps and upgrade the drainage systems in Hesperia to Victorville in the center divider/right shoulders on Interstate 15 in San Bernardino County. This project will not add a extra lane to the freeway or for a train.

Crews continue excavation and paving operations

This new traffic patterns will go on for months from Oak Hill Road to Bear Valley Road in both directions. The traffic patterns is for crews to remove and replace concrete.  Expect Major Delays at night and around 4am in the morning daily.

  • Highway 395 connector closures could be closed in both directions at night at times.

In observance of the Labor Day Holiday weekend: No lane closures/work to take place beginning Friday, September 1 at 6am to Tuesday, September 5 afternoon.

Monday night –  Friday morning 8/28-8/31

Northbound I-15 from Oak Hill Rd to Main Street – 9pm. to 7am*

  • Alternating lane closures, possibly bringing lanes down to one.
  • All on and off ramps are subject to intermittent closures for crew safety and related roadwork.
  • Traffic maybe backup after Highway 138 for about 2 miles.

Southbound I-15 from Main Street to Oak Hill Rd – 7pm. – 4am*

  • Alternating lane closures, possibly bringing lanes down to one.
  • All on and off ramps are subject to intermittent closures for crew safety and related roadwork.

The new traffic patterns will be North of the Hwy 395 on the I-15 a traffic switch is in place. The NB traffic, just north of the Hwy 395, is detoured into the median to enable crews to remove and replace concrete.

*Times can subject to change and could go longer or start earlier. On and off ramps may be subject to closure. Please use caution and remember to reduce your speed when approaching and driving through the construction zones. Schedules are subject to change due to inclement weather or construction issues.

The project is expected to be complete in early 2025.

There are more ways to follow the Pain In The Pass. Join the Traffic Group on Facebook with over 130,000 members. Join the group on MeWe. Like us on the NEW page on Facebook. Follow us on NewsBreak, and also follow us on Instagram, Threads, and X aka Twitter.

loader-image
Cajon Pass
9:40 pm, Apr 27, 2026
temperature icon 46°F
clear sky
Humidity: 68 %
Pressure: 1017 mb
Wind: 9 mph
Wind Gust: 6 mph
Clouds: 5%
Visibility: 10 km
Sunrise: 6:03 am
Sunset: 7:30 pm
  • Temperature
  • Precipitation
  • Rain Chance
  • Wind
  • Humidity
  • Pressure
11:00 pm
temperature icon
44°/46°°F 0 mm 0% 7 mph 68% 1017 mb 0 mm/h
2:00 am
temperature icon
43°/45°°F 0 mm 0% 5 mph 73% 1017 mb 0 mm/h
5:00 am
temperature icon
42°/43°°F 0 mm 0% 2 mph 77% 1017 mb 0 mm/h
8:00 am
temperature icon
49°/49°°F 0 mm 0% 2 mph 56% 1018 mb 0 mm/h
11:00 am
temperature icon
59°/59°°F 0 mm 0% 2 mph 31% 1017 mb 0 mm/h
2:00 pm
temperature icon
65°/65°°F 0 mm 0% 6 mph 23% 1015 mb 0 mm/h
5:00 pm
temperature icon
64°/64°°F 0 mm 0% 11 mph 26% 1014 mb 0 mm/h
8:00 pm
temperature icon
56°/56°°F 0 mm 0% 7 mph 47% 1015 mb 0 mm/h